Â鶹Éç¹ú²ú

Skip to content

Â鶹Éç¹ú²úCanyon bound for public hearing

Public will be able to provide feedback on proposed tourist attraction on March 10
Â鶹Éç¹ú²úCanyon
What Â鶹Éç¹ú²úCanyon will look like at build out.

Speak or forever hold your peace — a date has been set.

Members of the public will be able to comment on the proposed Â鶹Éç¹ú²úCanyon project on Tuesday, March 10 at The 55 Activity Centre at 6 p.m.

 The project has already passed two readings, and is looking to rezone 10.5 hectares of land currently designated residential, as well as ecological reserve and protection into a comprehensive development zone.

 This rezoning would allow the proponent, Robin Sherry, to create hundreds of metres of elevated boardwalk and a canyon walkway. The proposal includes washrooms, a children's play area, a concession stand and a small stage, among other things.

 The project would be located in the Powerhouse Springs area, which is accessible via the Mamquam River Forest Service Road.

push icon
Be the first to read breaking stories. Enable push notifications on your device. Disable anytime.
No thanks